8 lines
354 B
Text
8 lines
354 B
Text
|
The primary goal of the Network UPS Tools (NUT) project is to provide
|
||
|
reliable monitoring of UPS hardware and ensure safe shutdowns of the
|
||
|
systems which are connected.
|
||
|
|
||
|
Network communications are used so that multiple systems can monitor a
|
||
|
single physical UPS and shut down together if necessary without any
|
||
|
special "sharing hardware" on the UPS itself.
|